Skip to content
Peterson Grading & Paving, Inc. — home

S-06Earthwork & site preparation

Dirt works: earthmoving and site preparation

Land clearing, excavation, grading, hauling and site preparation — the essential foundation for any project.

Double-drum roller compacting a graded dirt lot with mountains in the distance

Moving earth to project specifications

Our expertise extends to comprehensive dirt works: earthmoving and shaping the landscape to meet project specifications. Whether we are excavating for foundations, creating embankments or sculpting the terrain for proper drainage, our team is committed to precision and efficiency.

We bring the right equipment and industry best practices to every dirt works project and carry it out with care. Getting the earthwork right contributes to the success and durability of the whole construction effort.

Excavated trench running along a dirt roadside toward distant mountains and wind turbines
FIG. 01 — Excavation along a roadside ahead of grading and paving.

From raw ground to a ready site

  1. Clearing — removing vegetation and debris from the work area.
  2. Excavation and embankments — cutting and filling to reach design elevations.
  3. Hauling — moving material on and off site.
  4. Grading — shaping the surface for drainage and a uniform base.
  5. Hand-off to paving or building construction.
Excavated trench running along a dirt roadside toward distant mountains and wind turbines
Compact loader grading a dirt road shoulder near wind turbines
Grader shaping soil next to a freshly paved, curving asphalt drive at a new industrial development

Questions

Dirt Works questions

What is included in dirt works?

Land clearing, excavation for foundations, creating embankments, shaping terrain for drainage, grading, hauling and general site preparation.

Is dirt work the same as grading?

Grading is one part of dirt work. Dirt work covers the broader earthmoving — clearing, excavating, filling and hauling — while grading shapes the final surface for drainage and a level base.

Do you also pave after site preparation?

Yes. We can carry a project from dirt work and grading through new asphalt or concrete paving.

S-06Request a quote

Talk to us about Dirt Works.

Share a few details and our estimators — who have worked extensively in the field — will follow up with an accurate, experience-based estimate.

Required. We only use your details to respond to this request.